top of page
Search

The New Land Rush: Why Finding Data Center Space Is Now a C-Suite-Level Decision

  • scottwhalen98
  • Apr 19
  • 3 min read

By the time you realize you need data center space — it might already be gone.


That’s not hyperbole. In 2025, the combination of AI’s explosive compute demands, edge computing expansion, and hyperscaler real estate gobbling has created a supply-demand crisis across global data center markets. Power is scarce. Space is booked. Lead times have ballooned.


And if you’re a mid-market or enterprise business leader trying to make smart decisions about where your environments should live next — it can feel like someone changed the rules of the game while you were still on the field.


The Data Center Drought, Explained

A few years ago, placing your infrastructure was mostly a pricing, latency, or security decision. Today? It’s a resource availability battle.


Here’s what that looks like in the numbers:-

  • Vacancy rates in primary U.S. markets dropped below 3% in early 2025, despite a record 4.4 GW of new capacity delivered in 2024.

  • Hyperscalers like AWS, Microsoft, and Google are consuming up to 80% of new space in top-tier regions, much of it for AI training and inference environments.

  • In Europe, power restrictions and zoning limits have slowed builds in FLAP-D markets (Frankfurt, London, Amsterdam, Paris, Dublin), pushing demand to secondaries like Milan, Warsaw, and Madrid.


Power Is the New Currency

It’s not just about square footage anymore — it’s about the ability to power it. With many utilities stretched and sustainability mandates tightening, colocation providers are being forced to get creative: on-site renewable energy, battery and microgrid storage, advanced cooling.


For CIOs and CTOs evaluating options, power provisioning has become a strategic risk category, not just a facilities one.


From Hyperscaler to Hybrid: Rethinking Placement Strategy

Hyperscalers are gobbling up capacity — but also offering alternatives. From Google’s private cloud zones to Azure Stack and AWS Outposts, enterprise buyers are being lured into platform-centric thinking.


That’s not necessarily wrong — but it comes with risks: vendor lock-in, opaque pricing, limited exit flexibility. Smart leaders are rebalancing toward neutrality — embracing a multi-cloud, hybrid, and modular strategy that allows them to pivot.


The Mid-Market Squeeze

For mid-market CIOs, the pressure is different:

  • No fleet of brokers finding space

  • No ability to pre-buy power years ahead

  • No current market knowledge of what’s available


Their 2020 strategy no longer maps to the 2025 reality.


Three Questions to Ask in 20251.

  1. Are we placing workloads based on business needs — or market constraints?2.

  2. Do we have visibility into viable alternatives?3.

  3. Who is giving us an independent, non-vendor-driven view of the playing field?


Where NextWayve Fits In

At NextWayve, we specialize in helping mid-market and enterprise leaders assess infrastructure strategy with clarity. We map available options, understand your workloads, and curate the providers who are ready to meet your needs — with flexibility, transparency, and growth in mind.


AI and cloud demand may be rewriting the rules. But with the right partner, you don’t have to play catch-up.


Map Visual – U.S. Data Center Market Stress (2025)

Here’s a simplified framework you can hand off to a designer or developer as placeholder content:

Market

Tier

Capacity Status

Color Code

Ashburn, VA

Tier 1

Critically constrained power

🔴 Red

Hillsboro, OR

Tier 1

Nearly full, expansion limited

🟠 Yellow

Phoenix, AZ

Tier 1

High demand, new builds in progress

🟠 Yellow

Dallas, TX

Tier 1

Tight but stable

🟢 Green

Atlanta, GA

Tier 2

Moderate demand, power availability okay

🟢 Green

Chicago, IL

Tier 2

Filling up, power concerns emerging

🟠 Yellow

Salt Lake City, UT

Tier 2

Growing hub, still room

🟢 Green

Reno, NV

Edge/Tier 2

Emerging market, AI-focused

🟢 Green

Pre-2020 vs. 2025 Data Center Strategy Comparison

Here’s a clean version for the comparison table:

Category

Pre-2020 Strategy

2025 Strategy

Workload Focus

Traditional IT, ERP, websites

AI/ML, high-performance compute, hybrid cloud

Power Strategy

Single utility source, low redundancy

Multi-source, power redundancy, grid-aware scaling

Cooling Systems

Raised floors, air cooling

Liquid cooling, immersion, AI-optimized airflow

Deployment Speed

12–24 months per build

Modular builds, 90–180 days, just-in-time provisioning

Tenant Model

Single-tenant or wholesale only

Multi-tenant, cloud on-ramps, interconnection hubs

Location Strategy

Tier 1 markets only

Edge locations, secondary markets, low-cost power zones

Sustainability Focus

Not a priority

Renewable sourcing, PUE targets, carbon neutrality


 
 
 

Comments


bottom of page